始正式的审核。
Fulfilment is considered as a prerequisite for IRIS
certification。
满足K.O.问题的要求是开始IRIS认证的前提条件。
K.O. questions are not scored。
K.O.问题不打分。
When a K.O.requirement is not met,the whole audit
fails。The Certification process has to start with a new
request(covering the full audit process again)。
一旦K.O.问题没有满足,将不能通过审核。组织需要重新递交认证申请(审核过程将重新覆盖所有要素)。
K.O.问题一共12个,其中2个只适用于信号系统的公司。
Quality Management System - General requirements
质量管理体系-通用要求
In case of transfer or outsourcing of activity with
the execution of a contract does a transfer procedure
including:feasibility study,nsk analysis,planning,communication to
customer and FALs to the appropriate level
exist?
当合同执行过程中有转让或者外包的情况发生,是否有转让的程序?其内容包括:可行性研究,风险分析,策划,客户沟通和首件检验,这些内容有在适当的水平上吗?
Design and development(For Signalling
only)设计和开发(仅适用于信号系统)
Does the organization apply the principles in
developing high integrity System in line with the CENELEC
standard
or other agreed equivalent models?The software design process must
explicitly implement the requirements of EN
50128 related to safety integrity of the intended scope of the IRIS
certificate。
组织在开发高集成系统时是否应用在CENELEC标准或其它协议的等效标准?软件开发过程必须实施EN50128的要求(与IRIS证书范围的安全集成有关时)。
CENELEC-European committee for electro-technical
standardization 欧洲电工技术标准委员会
Design and development inputs 设计和开发输入
Does the organization ensure new technologies / new
products are validated before being introduced in a customer
project?
组织是否确保新技术/新产品在引入顾客项目前得到确认?
Design and development validation 设计和开发确认
Does the organization ensure that
reports,calculation,test results,etc,demonstrate that the
product
definition meets the specification requirements for all the
relevant operational conditions?
组织是否确保报告、计算、测试结果等能够展示产品定义满足所有相关的运行条件的规范要求?
Design approval(For Signalling
only)设计批准(仅仅适用于信号系统)
Does the organization provide a documented
procedure defining the safety case and approval in line with
this
standard?组织是否准备了文件化的程序,用于按照这个标准要求明确安全情况和批准?
Validation of processes for production and service
provision 生产和服务提供过程的确认
Are special processed managed according to the
contractual requirements?特殊过程是否按照合同要求进行管理?
Project Management 项目管理
Does the organization implement a documented
project management(PM)approach or System,or new product
development process addressing the applicable areas of
PM,describing roles and responsibilities,integrating the
whole functions of the organization in a multidisciplinary
team?
组织是否实施项目管理方法或体系,或新产品开发过程,涉及项目管理的使用领域,描述职责和任务,整合组织内所有相关职能形成多功能小组?
Quality management 质量管理
Does the organization ensure that the process is in
place to manage project deliverables?
组织是否确保有过程来管理项目是可以交付的?
Change management 变更管理
Are verification,validation AND APPROVAL,activities
defined,to ensure compliance with customer requirements BEFORE
IMPLEMENTATION?
在实施前,是否定义了验证、确认和批准活动,以确保符合顾客要求?
First article inspection(FAI)首件检验
Does the organizations System provide a documented
procedure defining inspection,verification and documentation
of a representative item from the first serial production run of a
new part or following any subsequent change that
invalidates the previous first article inspection result?
Note:if the product is a one-off or a software,FAI
is meant as validation
组织的体系是否有文件化的程序,规定在新零件首次批量生产时(或任何随后的会导致先前的首件检验结果失效的变更引入时)代表性零件的检验、验证和文件化?
注:如果产品仅是一个或是软件,FAI就是指得是确认。
Commissioning / Customer service 测试/客户服务
Does the organization provide a process for field
services/Do field processes provide:actions to be taken where
problems are identified after delivery,including
investigation,reporting activities and actions or service
Information。
组织是否有现场服务的过程?现场服务过程是否提供,在交付后,当发现问题时,要采取相应的措施,包括调查,报告活动和服务信息的措施?
Control of nonconforming processes 不合格过程的控制
In the event of business management process
variation,does the organization have a process in place to;
a)Identify and record the variation,and if the
business management process is non-conform to take
appropriate
action tot correct the nonconforming process?
b)uate whether the business management process
variation has resulted in product nonconformity?
c) Identify and control the non-conforming
product?
当发生过程偏差时,组织是否有过程来:a)识别,记录偏差并采取适当行动,纠正不合格的过程,b)评估是否过程偏差已经导
致产品不合格,并且c)识别并控制不合格的产品?
Quality management/质量管理
Does the organization ensure that a process is in
place to manage project deliverables?
组织是否确保有过程来管理项目是可以交付的?
The organization has a structured,appropriate
project related quality system in place with
manuals,procedures
and quality plans to manage project deliverables
组织有结构化的、合适的与项目有关的质量体系,包括手册、程序和质量计划来管理项目是可以交付的。
Change management/变更管理
Are verification,validation AND APPROVAL activities
defined,to ensure compliance with customer requirements BEFORE
IMLEMENTATION?
在变更实施前,是否定义了验证,确认和批准活动,以确保符合顾客要求?
Verification,validation and approval activities are
defined,to ensure compliance with customer requirements
BEFORE IMPLENMTSTION。Process implemented and records are
available
在变更实施前。定义了验证、确认和批准活动,以确保符合顾客要求。过程得到了实施并有记录。
Open Questions 开放式问题项
Each individual requirement(question)shall be
scored progressively using maturity levels。
每项要求(每个问题)将按照成熟度级别被评分。
Maturity levels and relevant expected evidences
shall be interpreted consistently with audit scope and
company
characteristics。
等级的评定依据和相关的审核发现必须是一致的。
Maturity Level
成熟度级别
|
Is the requirement met?
是否满足要求?
|
Point
分数
|
“Optimized”优秀
|
Exceeded and continuously improved
|
4
|
“qualified”合格
|
Exceeded 超过要求
|
3
|
“defined”满足
|
Met in full 达到要求
|
2
|
“poor”差
|
Partially met 部分满足要求
|
1
|
“insufficient”不满
|
Not met 不满足要求
|
0
|
Compliance
符合性
|
Level
等级
|
Points
分数
|
Action requested
要求措施
|
Open questions
开放式问题项
|
Closed questions
封闭式问题项
|
Compliant
符合
|
Optimized
优秀
|
4
|
no specific action expected
审核中没有更高的改进要求被提出
|
|
Qualified
合格
|
3
|
Improvement action might be
expected
可能要求采取改进措施
|
|
Defined
满足
|
2
|
Improvement action requested;Closed
within 12 months
被要求采取改进措施,并在12个月内关闭改进项
|
No specific action expected
审核中没有更高的改进要求被提出
|
Compliance
符合性
|
Level
等级
|
Points
分数
|
Action requested
要求措施
|
Open questions
开放式问题项
|
Closed questions
封闭式问题项
|
Non
Compliant
不符合
|
Poor
差
|
1
|
Corrective action requested;Closed
within 90 days
被要求采取纠正措施,并在90天内关闭整改项。
|
|
Insufficient
不满足
|
0
|
Corrective action requested;Re-Audit
within 90 days
被要求采取纠正措施,并在90天内接受重审。
|
Corrective action requested;Re-Audit
within 90 days
被要求采取纠正措施,并在90天内接受重审。
|
————————————
IRIS认证、IRIS内审员培训、RAMS培训咨询服务
我们提供的IRIS认证相关服务:
IRIS认证咨询服务
IRIS内审员培训(IRIS 02版培训、IRIS最新版培训)
IRIS标准理解与实施培训
RAMS培训/铁路设施-可靠性、有效性、维修性和安全性(RAMS)培训
LCC培训
电话:010-51266801 13693016211 张老师
http://www.hepsoar.com
http://hepsoar.blog.163.com/
我们提供的部分认证咨询服务:ISO9001认证咨询;ISO14001认证咨询;OHSAS18001认证咨询;ISO/TS16949认证咨询;AS9100认证咨询;IRIS认证咨询;
ISO22000认证咨询; ISO13485;ISO17025;ISO27001; CCC;CEmark;Emark等